SCHEDULE OF FINISHES
ERF 169568 BOFORS CIRCLE, EPPING II
WALLS:Exterior – Face brick
Boundary and interior walls bagged brickwork.
FLOORS:Factory floors rotary trowelled finish – 125mm / 25mpa
Offices tiles (hardwearing)
Toilets and tea nooks ceramic tiles
Stores and workshops same as factory floor
ROOF:Portal Frame and steel columns as per engineer specifications.
Chromadeck or similar sheeting with Polycarp panels
Light panels and ridge vents
TILING:Behind basins and sinks provide ceramic tiles to ht of 300 min.
SANITARY WARE:Toilet pans white ceramicCisterns ceramic (white)
Stainless sinks with cupboards below, 1 m units.
DOORS:Internal doors hollow core with steel frames painted.
External doors – aluminium.
Locks to internal doors 2 lever Union and external door locks 3 lever.
WINDOWS:All standard aluminium windows sizes
STAIRS:Reinforced concrete, tile with non slip ceramic tiles
Balustrades and handrails galvanized steel
CEILINGS: Factory space has no ceilings but will have sisalation under roof covering.
Ceilings in offices and toilets.
ELECTRICITY: 60 amps, 3 Phase supply with sufficient plugs and lights
WATER: Water supply 80mm to development
PAVING: Cement pavers for heavy duty access
FENCING: Palisade steel fencing